Town Planning Suite — from the survey to a comprehensive town plan.
Plan a new town, a new district or a housing scheme on open land: the site survey and terrain, an automatic first layout and a plan editor, the master plan, services and networks, subdivision and development control, compliance — and the civil roads, utilities and networks beside them. It runs on the platform of the ASH Engineering Design Suite, with every figure labelled for what it is.
Preview: this is a trial build for planners, and its question is whether every tool needed for a comprehensive town plan is there. Tabs may change. Register with your e-mail address and we send you a trial code; the same code opens the Design Suite, ELDAS and the other preview suites. Trial reports, plan documents and exported data carry a trial mark and are not for issue.
Recommended: Chrome, Edge or Firefox on a laptop or desktop screen about 1,280 px wide or more. The trial and your work live in this browser's storage — Safari and iOS may clear it after 7 days without a visit; save your project file regularly.
Work you save in the browser is deleted when the trial ends — save your project file before then.
For the full version contact [email protected].
11 tabs, from the site to the sheet set.
The suite plans new towns, new districts and housing schemes on open land. Planning inside an existing town — existing buildings, streets and plots as the starting point — is not covered yet. A value not taken from a document in the ASH library is labelled ‘engineering default’.
Planner walk-through (fourteen steps from the site to the sheet set), the deliverables list and combined report, planning basis, about, feedback and known limits.
The eight planning stages from site analysis to phasing and implementation, the engagement register, KPIs and monitoring.
Survey and topography, boundary, constraints, net developable area; a preliminary terrain when there is no survey yet.
Auto layout, concept options compared side by side, the plan editor, planning units, land utilisation and the A3 plan sheets.
Planning basis, land-use budget, blocks and plots, community facilities, walkability, open space, phasing and feasibility.
Centres, jobs, the green–blue network, access, movement network, public transport and cycling, traffic and infrastructure capacity.
Development control, the plot register, developer operations and plot sheets.
Authority profiles and the compliance matrix: Compliant, Marginal or Non-compliant for every check.
The Civil bench's roads and parking pages.
Demands, trunk networks and utility corridors.
The Civil bench's network pages.
What this preview does not do.
Scope
- New towns, new districts and housing schemes on open land; an existing town as the starting point is not covered yet
- The suite is a first-layout generator, not a designer: generated layouts and the three examples are first drafts by rule
- Drawings are schematic planning drawings, not construction drawings
Data and figures
- A layout needs a survey with spot levels, or a preliminary terrain, which marks the whole plan preliminary
- Land-use, development-control, traffic and network design figures are engineering defaults until the authority's own are entered
- DWG files are not read or written: save as DXF from the CAD program
Use
- Made for a laptop or desktop screen; a phone is too small for the plan editor
- An aid to qualified engineers and planners; the responsible engineer checks and approves
- Trial output is for evaluation, not for issue
The full list of known limits is inside the product, under Project › About, feedback & known limits.
How is this different from the Design Suite or ELDAS?
It is a standalone planning product on the same platform core as the Design Suite (release 2.90): the planning tabs of a town plan, with the Civil bench's roads, utilities and networks beside them. See the other previews: ASH Mechanical & Plumbing Suite M1.12 · ASH Fire & Life Safety Suite S1.12 · ASH Civil Suite C1.13; or the Design Suite and ELDAS.
Do I need a survey?
A layout needs ground levels, because drainage, retention lakes, road grades and utility corridors follow the ground: import the spot levels and the boundary corner points (CSV or XLSX, metres or feet). Before the survey exists, enter the boundary and make a preliminary terrain from an overall fall; every page, sheet and report is then marked preliminary — no survey, and the drainage, lakes, levels and trunk depths are indicative only.
Which computer and browser?
A laptop or desktop screen about 1,280 px wide or more, in Chrome, Edge or Firefox. A phone is too small for the plan editor and the plan map, and a tablet in portrait is too narrow for the editor; the product says so, and pages can still be read.
Where do the figures come from?
Road and utility rules quote RC GEM 2016 Rev 0 and EXPRO clauses. Land-use, zoning, development-control, traffic and network design figures are engineering defaults, labelled on every page: enter your authority's figures in the planning basis, the development-control table or an authority profile. UAE, Qatar and international bases start as copies of the Saudi default table and are flagged. See Validation.
Is my project data sent anywhere?
Your project never leaves your computer: the suite keeps projects in the browser and in the files you save. Registering sends only the details you enter in the form. See the privacy notice.
How do I send feedback?
Use ✉ Feedback in the header of any page. It opens your e-mail program with the product, version, page, planning stage and project filled in, and three questions: what you did, what you expected, and what happened, what is missing or what would help. Without an e-mail program it offers to copy the text; send it to [email protected].
How do I get the full version?
E-mail [email protected] with what you plan, whether you plan or review, and how many people would use it. We reply within one business day.